The Code Enforcement Officer will be in training Thursday the 11th and 18th. Please feel free to call her if you have any questions. 207-716-6845.
Town Clerk
April 4th and 5th
The Town Office will be closed Thursday the 4th due to the incoming weather. The Selectboard meeting on the 4th has been rescheduled for next Thursday on the 11th.
The office will also be closed Friday the 5th.
We apologize for any inconvenience.
Friday March 29, 2024
The Town Office will only be open from 10am – 2pm on Friday March 29th.
I apologize for the inconvenience.
Accepting Applications
The Town of Embden is now accepting applications for the following appointed positions.
Planning Board
Board of Appeals
Animal Control
Plumbing Inspector
E-911 Addressing Officer
General Assistance Officer
Code Enforcement Officer
Assessor
Applications can be found on the Town Website or picked up at the Town Office.
All applications must be turned in by 6pm March 28th, 2024.
Work Session Thursday March 21st, 2024
There will be a work session held at 5:30pm Thursday March 21st at the Embden Community Center to discuss the definition of the “Temporary Large Dock System”.
A Public Hearing will be determined at a later date.
2024 New Building Permit Fees
This new schedule for fees will become effective April 1, 2024. The Selectmen raised the fees for
building permits, etc. in order to bring the Town of Embden in line with other communities in the area.
Rural and Shoreland Residential Permits
(includes dwelling, garages, additions, sheds,
carports, decks and porches, and mobile
homes. Any construction over 200 square feet) Min. Fee $100.00 or $0.25 per square foot.
Subdivisions
Initial Applications $100.00
Preliminary Plan $50.00 per lot
Rest of fees set out in subdivision ordinance
for minor and major subdivisions
Commercial
All buildings Min. Fee $500 or $0.25 per square foot
Cellular Tower Permit $2,500.00
Additions to Tower $250.00
Addressing Fee $0.00
New Entrance Fee $50.00
New driveway off public road
Solar Facility Min. $2,500.00 plus $0.10 per square
Foot of panel area
Appeals $250.00
Other fees: Applicant pays the cost of legal notices, mailings,
copying, and any other costs associated with the permit review
process.
Wednesday, March 13th 2024
The Town Office will open at 10am on Wednesday, March 13th due to training.
Results of 2024 Town Meeting
The results of the 2024 Town Meeting held on March 2, 2024 are available in the PDF below:
No Vote on Artilce 37
March 1, 2024
Due to further changes needed to Article 37. The Select Board will be passing over this Article at Town Meeting March 2,2024.
There will be no vote on Article 37.
Article 37. To see if the Inhabitants will vote to amend the Embden Shoreland Zoning Ordinance:
Add to Definitions
Temporary Large Dock System – A dock extending into a body of water over or below the normal high-water line that has any of the following characteristics:
- Is designed or intended for docking more than three motorized boats/watercraft of any size;
- Extends into the water more than 50’ from normal high water;
- Is moored to the floor of the waterbody pursuant to a submerged land lease issued by the Maine Department of Agriculture, Conservation & Forestry, Bureau of Parks & Lands;
- The dock benefits any property including subdivisions or a multi-family structure.
Add to Section 15.(C) the following:
15.(C)(11) A person or entity wanting to install a temporary Large Dock System as defined herein must first obtain a permit from the Code Enforcement Officer. Temporary Large Dock Systems must be installed no less than 100’ (at the shoreline) from the boundary with the nearest abutter. Annual renewal of the permit for a Temporary Large Dock System is not required unless any of the following changes from the original permit are planned:
a. The length of the dock over the water is to be increased.
b. The dock’s capacity is to be expanded to include additional boat slips.
c. The dock is to be relocated either at the shoreline or its location over the water.
If any of these changes are to be implemented, the person or entity must apply for a new permit from the Code Enforcement Office. Once issued, annual renewal is not required unless any of the above-listed changes are planned.
This section applies to all docks qualifying as Large Dock Systems regardless of when it was first installed.
Respectfully,
Embden