2024 New Building Permit Fees

This new schedule for fees will become effective April 1, 2024.    The Selectmen raised the fees for

building permits, etc. in order to bring the Town of Embden in line with other communities in the area.

Rural and Shoreland Residential Permits

(includes dwelling, garages, additions, sheds,

carports, decks and porches, and mobile

homes. Any construction over 200 square feet)          Min. Fee $100.00 or $0.25 per square foot.

Subdivisions

Initial Applications                                                                $100.00

Preliminary Plan                                                            $50.00 per lot

Rest of fees set out in subdivision ordinance

for minor and major subdivisions

Commercial

All buildings                                                                           Min. Fee $500 or $0.25 per square foot

Cellular Tower Permit                                                        $2,500.00

Additions to Tower                                                      $250.00

Addressing Fee                                                                    $0.00

New Entrance Fee                                                        $50.00

New driveway off public road

Solar Facility                                                                        Min. $2,500.00 plus $0.10 per square

                                                                                          Foot of panel area

Appeals                                                                          $250.00

Other fees:  Applicant pays the cost of legal notices, mailings,

copying, and any other costs associated with the permit review

process.

Results of 2024 Town Meeting

The results of the 2024 Town Meeting held on March 2, 2024 are available in the PDF below:

2024 Town Meeting Results (PDF)

No Vote on Artilce 37

March 1, 2024
Due to further changes needed to Article 37. The Select Board will be passing over this Article at Town Meeting March 2,2024.
There will be no vote on Article 37.
Article 37. To see if the Inhabitants will vote to amend the Embden Shoreland Zoning Ordinance:
Add to Definitions
Temporary Large Dock System – A dock extending into a body of water over or below the normal high-water line that has any of the following characteristics:

  1. Is designed or intended for docking more than three motorized boats/watercraft of any size;
  2. Extends into the water more than 50’ from normal high water;
  3. Is moored to the floor of the waterbody pursuant to a submerged land lease issued by the Maine Department of Agriculture, Conservation & Forestry, Bureau of Parks & Lands;
  4. The dock benefits any property including subdivisions or a multi-family structure.
    Add to Section 15.(C) the following:
    15.(C)(11) A person or entity wanting to install a temporary Large Dock System as defined herein must first obtain a permit from the Code Enforcement Officer. Temporary Large Dock Systems must be installed no less than 100’ (at the shoreline) from the boundary with the nearest abutter. Annual renewal of the permit for a Temporary Large Dock System is not required unless any of the following changes from the original permit are planned:
    a. The length of the dock over the water is to be increased.
    b. The dock’s capacity is to be expanded to include additional boat slips.
    c. The dock is to be relocated either at the shoreline or its location over the water.
    If any of these changes are to be implemented, the person or entity must apply for a new permit from the Code Enforcement Office. Once issued, annual renewal is not required unless any of the above-listed changes are planned.